You are currently browsing the monthly archive for April, 2007.
Constructing the baseboards
April 14, 2007
Having already planned the layout and produced the trackplan it was time to actually start building something.
To start with a simple open framework of 2x1" is fixed in place.
At the end furthest from the loft hatch, the framework to join the two sides is taking shape. This will form the site of ‘Dalesmouth’ station. The raised portion is to take the upper level.
The end nearest the loft hatch is the first part to be surfaced, and serves as a temporary work bench. Eventually, this is where ‘Crossdale’ station will be.