Work begins…
The first job was to prepare the loft by putting in a loft ladder, boarding out the floor and laying on electrics.
The loft ladder was the first stage and took an afternoon.
The loft boards were next and went down quite quickly. As soon as the first few were down, creating a stable surface, it became easier to work.
Next, two flourescent lights were installed with a switch next to the loft hatch.
With the loft basically fitted out and some spare carpet laid, thoughts can now turn to building the layout.